Useful Documents

These documents can be easily downloaded by simply clicking on the one you would like.

Stage Plans

Individual Lot Plans

Deposited Plans

BAL Reports

Other Useful Documents

Boundary Fencing & Front Landscaping included for all lots.

Estate Entity Details

Parcel Property Pty Ltd  ABN: 66 153 825 542
PO Box 175
Leederville WA 6903

 

The following steps outline the instructions to complete a Design Application.

  • Step 1 – Specify what Lot you are submitting plans for
  • Step 2 – Upload Plans (site plan and elevations)
  • Step 3 – Nominate your point of contact
  • Step 4 – Comments
  • Step 5 – Submit Application

A representative will endeavour to provide an approval within 5 working days. If you need to make changes or withdraw your application or have any queries, please email: [email protected]

  • Lot & Owner Details

  • Point of Contact

  • Uploads

  • Drop files here or
    Accepted file types: jpg, png, pdf, Max. file size: 8 MB, Max. files: 5.
    • Drop files here or
      Accepted file types: jpg, png, pdf, Max. file size: 8 MB, Max. files: 5.
      • Drop files here or
        Max. file size: 4 MB.
        • Drop files here or
          Max. file size: 4 MB.

          Title Updates

          Please see below the title and survey update. Please note that not all of these stages are open to the public and some are still classed as construction sites.

          Before visiting the site to conduct surveys, please call the relevant contact to ensure there are no issues with any specific lot.

          All personnel MUST notify the site supervisor before entering the site and be equipped with the appropriate PPE.

          Site Surveys & Classification Reports – These certificates are to be used as a guide only and the builder needs to carry out their own investigations based on their specific design and construction methodology requirements.

          Supervisor: John Macdonald on 0404 076 009. Access will only be available when arranged through the contractor.

          ProjectJindowie
          Stage25
          DP Number427271
          Expected Title DateAugust 2024
          Expected PC DateTBC
          Available for SurveyNo
          Site ReportsTo be completed
          ZoningRMD Codes simply outline acceptable variations to the deemed-to-comply provisions of the R-Codes.

           

          ProjectJindowie
          Stage24
          DP Number408849
          Expected Title DateTitled
          Expected PC DateComplete
          Available for SurveyYes
          Site ReportsClick here for reports

           

          ProjectJindowie
          Stage23
          DP Number423863
          Expected Title DateTitled
          Expected PC DateComplete
          Available for SurveyYes
          Site & Survey Reports

          Lots 905 to 1123

          Lots 1124 to 1158

           

          ProjectJindowie
          Stage22b
          DP Number423341
          Expected Title DateTitled
          Expected PC DateComplete
          Available for SurveyYes
          Site & Survey ReportsClick here for reports

           

          ProjectJindowie
          Stage22a
          DP Number422564
          Expected Title DateTitled
          Expected PC DateComplete
          Available for SurveyYes
          Site & Survey ReportsClick here for reports

           

          ProjectJindowie
          Stage17
          DP Number420815
          Expected Title DateTitled
          Expected PC DateComplete
          Available for SurveyYes

           

          ProjectJindowie
          Stage18B
          DP Number418821
          Expected Title DateTitled
          Expected PC DateComplete
          Available for SurveyYes

           

          ProjectJindowie
          Stage19
          DP Number419668
          Expected Title DateTitled
          Available for SurveyYes
          Site & Survey Reports AvailableClick here for reports
          BAL CertificatesAvailable
          BAL AssessmentJanuary 2021